Assembling The Berg PlayBase
Assembling And Installing The Berg PlayBase
What’s Involved in Installing Your BERG PlayBase?
We want to ensure your installation experience is smooth, safe, and stress-free. Here’s everything you need to know about setting up your BERG PlayBase at home.
✅ What’s Included
Each BERG PlayBase package includes:
- A premium powder-coated steel frame (available in Medium or Large)
- Two end attachments (choose from tumble bars and/or ladders)
- All required fasteners and fixings
- Clear assembly instructions and safety guidelines
You can also add a wide variety of accessories to create your own play, fitness, or lounge setup.
The Berg PlayBase is designed for straightforward installation. Here are the steps for assembly:
Assembling the Berg Playbase:
Step 1: Assemble the frame with a minimum of 3 people.
Step 2: Determine the position of the frame and keep a clearance of 2.2 meters all around the frame.
Step 3: Mark the position of the legs of the frame by outlining the ground around them. Set the frame aside and dig the necessary holes for the legs and slots.
Step 4: Place the frame level in the dug holes and slots with a minimum of 4 people.
Step 5: Shovel the remaining excavated soil back and smooth it with a rake.
Step 6: Tamp down the soil in the coming days before using the frame to its maximum capacity.
While three people can generally assemble it, professional installation services are also available if preferred.
Check Out The Berg PlayBase Assembly Video Below
